The date of Practical Completion is the date set be the Contract Administrator and agreed by the Contractor that all works under the contract will be completed.
contracts
Practical completion is the point in construction when the Contract Administrator confirms the completion of construction works of a project.
Liquidated damages are damages whose amount the parties designate during the formation of a contract for the injured party to collect as compensation upon a specific breach (e.g., late performance).
A Bill of Quantities (BoQ) is a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized.
On a project that involves earth works as well as planting, using a JCLI contract would not be the best option, since it doesn’t allow for clauses more specific to the earth works.
The main reason for choosing between a contract under hand rather than under deed, may be the liability period associated with each one.
The changes between the JCLI 2012 and the 2017 edition, are summarised below:
For the client to terminate the contract, there needs to be a breach of contract from the Contractor’s side which could be based on any of the following:
Contract termination is a process that needs to be used as a very last result and after careful consideration of what constitutes a valid basis for it.
Letting a contract begins with the letter of acceptance from the Client through the Contract Administrator after assessing the valid tenderers.
A pro-forma document is a standard document that is provided by an organisation, rather than a custom one. For example,…
Contract supervision can be a Landscape Architect’s responsibility, only if he’s appointed to be the Contract Administrator. A Landscape Architect’s…
Each form of contract might describe the contents of the agreement in a slightly different way, but the main subjects…
A Letter of Intent (LOI) in construction is a document that outlines the general terms and conditions of a proposed…
A Contractor is usually informed of Health and Safety issues at Tender stage through the Designer’s Risk Assessment. This is…
During an invitation to tender, it’s the responsibility of the Contract Administrator to identify the most suitable tenderers for the…