The final account is the conclusion of the contract sum and signifies the agreed amount that the employer will pay the contractor.
One common option is a performance bond so that money can be claimed from a guarantor bank at short notice, often simply on-demand.
A performance specification is a document that specifies the operational requirements of a component or installation.
A prescriptive specification conveys the requirements of a project through a detailed explanation of the materials that the contractor must use and the means of installing those materials.
When used in conjunction with a landscape construction contract, the JCLI LMWC should last for at least the duration of the rectification period.
JCLI states that the Rectification Period is 12 months after Practical Completion, unless otherwise agreed.
Fédération Internationale Des Ingénieurs-Conseils is an international standards organisation for the consulting engineering & construction best known for the FIDIC family of contract templates.
Limitation is a time-limit of when a party can raise a claim and is provided for in the Limitation Act 1980, although parties can agree in a contract that a shorter or longer limitation period will apply.
There are two types of certificates in construction, that are issued by the CA / QS: Payment & Progress certificates.
Novation is a mechanism whereby one party can transfer all its obligations and benefits arising from a contract, to a third party.
Both NEC and JCT contracts are standard forms of contract that are part of standard families for procuring works or consultancy services (JCT), goods, works or services (NEC).
The Private Finance Initiative (PFI) is a way of funding public projects with a private financer on board. It is a form of Public-Private Partnership (PPP).
Where the contractor is designing and building the works, a design and build contract is used. The burden of the risk is with the contractor.
The Health and Safety Executive (HSE) has advised that planting and general horticultural work are not considered ‘construction work’.
The CDM Regs 2015 apply in every building project in the UK regardless of whether it’s domestic, commercial, notifiable or non-notifiable.
If there was a discrepancy between the contract documents, the contractor would usually inform the Contract Administrator of this before proceeding.
Before any costs are applied, the reason for removal should be investigated by the Contract Administrator or the Clerk of Works.
The Certificate of Making Good Defects is a certificate that is in relation to the completion of defects, imperfections, shrinkage and any other fault raised during the Defects Liability Period.